Vaillant Heat Pump Installation — Newbury
A renewable heating upgrade for a six-bedroom Newbury home, replacing ageing oil heating with a designed Vaillant air source heat pump system.
Newbury, Berkshire
basement plant room upgraded with a Grant floor-standing boiler, hot water cylinders and professionally routed copper pipework.

Location
Berkshire
Time taken
2–3 days
Service
Heating Systems
basement plant room upgraded with a Grant floor-standing boiler, hot water cylinders and professionally routed copper pipework.
A period property required a reliable basement plant room upgrade to improve heating and hot water delivery across a larger home.
APS upgraded the plant room with a Grant floor-standing boiler, hot water cylinders and professionally routed copper pipework to support consistent heating and hot water performance.
Improved heating and hot water capacity with a professionally finished plant room installation suited to the property.
A renewable heating upgrade for a six-bedroom Newbury home, replacing ageing oil heating with a designed Vaillant air source heat pump system.
Newbury, Berkshire
Baxi combi boiler installed in a purpose-built airing cupboard with neat copper pipework, MagnaClean protection and reliable heating and hot water.
Berkshire